— PROJECT CASE

Roof Steel Structure Platform Project, Shiqi MixC Zhongshan (Perfect Golden Eagle Office Tower)

Shiqi MixC rooftop steel platform, installed structure
Shiqi MixC rooftop steel platform, beam connections
Shiqi MixC rooftop steel platform, site overview
Shiqi MixC rooftop steel platform, completed frame
Shiqi MixC rooftop steel platform under construction
Prefabricated steel connection brackets for the rooftop platform
Curved steel components fabricated for the rooftop platform
Steel base and connection plates for the rooftop platform
Project Video 1
Project Video 2
Project Video 3
Project Video 4

Project Overview

This project is located at Perfect Golden Eagle Office Tower, Shiqi MixC, Zhongshan. Jiubai constructed a large steel platform on the top floor of the high-rise building to support mechanical and electrical equipment.

Jiubai supplied all prefabricated steel components for the platform, including H-beams, secondary beams, connecting parts and embedded plates. The components were fabricated by laser cutting, bending and welding, with anti-corrosion painting completed in the factory.

The structure was designed for high-rise rooftop conditions and meets the wind-load, bearing-capacity and seismic requirements of long-term outdoor use.

Client Requirements

  • Custom rooftop steel structure for high-rise commercial building
  • Pre-fabricated steel members for fast on-site assembly
  • Anti-corrosion coating for long-term outdoor exposure
  • Compatible with the building curtain wall system

Our Solution

  • Factory-prefabricated members with anti-corrosion coating for fast on-site assembly
LET'S BUILD TOGETHER

Turn Your Vision into Reality

Contact us today for a tailor-made steel structure solution.